
Local brief
Bend building permits, September 28–October 4, 2026
Public notice. Bend’s public permit map service lists 105 permits with an issue date from September 28, 2026, through October 4, 2026.
Public notice. Bend’s public permit map service lists 105 permits with an issue date from September 28, 2026, through October 4, 2026.
Type descriptions: Electrical (27), ROW (19), New Construction/Installation (14), Mechanical (9), Sign Application for Permanent Sign(s) (8), Renovation/Alteration (6). Building category: Residential (54), Other (41), Commercial/Industrial (10). Use descriptions when present: Single Family Dwelling (47), Commercial or Industrial (9), Accessory Dwelling Unit (3), Townhome (Attached Single Family Dwelling) (2), Duplex (1).
Status: Permit(s) Issued (94), Closed (11). On the 28 rows that carried a project valuation, the summed figure was $6,339,030.
Central Oregon’s largest city still shows a residential backbone — single-family dwelling use tags lead where use is filled in — alongside electrical, ROW, mechanical, and sign work that keeps contractors busy even when big vertical permits are quieter.
For Deschutes County readers on /or/deschutes, a hundred-plus weekly permits is a solid mid-week construction pulse worth watching against winter slowdowns later in the year.
Source: the public notice on this register NN-MN1005-009 · filednearby.com.
This is a Notice Nearby local brief — an in-house explainer written from a government-posted notice on this register. It is not official minutes, not a newspaper story, and not Legal Publication.