Bend permits, September 27–October 3, 2026
Public notice. Bend's public permitting table lists 100 rows with an issue date from September 27, 2026, through October 3, 2026. The newest issue date in that set is October 2, 2026. The largest type descriptions were electrical (24), right-of-way (19), new construction or installation (12), mechanical (8), and permanent sign (8). The table returned 18 type descriptions in this window. This notice does not list a street address or an application number. Check the City of Bend's own copy before you rely on a filing.
Source: filednearby.com