Filed Nearby building-permit pack · October 5, 2026
Marin County building permits, September 28–October 4, 2026
Public notice. Marin County’s public data portal lists 101 building permits with an issue date from September 28, 2026, through October 4, 2026. The newest issue date in that set is October 4, 2026.

noticenearby.com/papers/ca-marin-building-permits-sep28-oct4-2026.pdf
Public notice. Marin County’s public data portal lists 101 building permits with an issue date from September 28, 2026, through October 4, 2026. The newest issue date in that set is October 4, 2026.
Of those 101 records, Residential leads with 98 rows and Commercial follows with 3. Those groups cover all 101. Residential work is about 97 percent of the week — a Marin-typical mix where household repairs, additions, and small residential projects dominate issued activity.
Three commercial permits are a small slice, but they still matter for town centers and employment sites from Novato through San Rafael to southern Marin. A commercial row clears a different inspection path than a kitchen remodel; both appear on the same county portal when the county is the issuer of record.
Marin County sits north of the Golden Gate with high housing costs and tight land use. Weekly permit counts are one of the few open signals that residential investment is still moving — seismic upgrades, additions, and fire-hardening work often hide inside a generic Residential type tag on the public file.
For neighbors in unincorporated Marin and county-reviewed projects, 101 issued rows with only three commercial tags say the week’s energy was on houses, not storefronts. That is a baseline, not a judgment about which town is “busy.”
Notice Nearby places this paper on /ca/marin. Compare later Filed Nearby pulls to see whether the commercial share rises above a handful of rows or residential continues to carry nearly the entire week.
Marin’s residential majority is not a surprise in a high-cost Bay Area county, but 98 residential versus 3 commercial is still a sharp split. If commercial rows climb in later weeks, that will show up clearly against this baseline.
Fire-hardening, soft-story, and addition work often hide inside a generic Residential type on county portals. This notice cannot invent those subtypes. It can say the county issued 101 permits in the window and almost all of them were residential.
What the count covers
This notice uses Marin County’s open data building-permits resource for issued_date values in the stated window. Type groups were Residential (98) and Commercial (3).
It is a countywide Marin County count. It does not list a street address, a permit number, or a contractor on this page. Confirm any single permit on the county’s own copy before you rely on it.
Residential weight
Residential tags are 98 of 101. Commercial tags are 3 of 101. The portal’s type field is the signal available on this pull; deeper subtypes may exist on the county’s full application view but are not required to read this weekly count.
Newest issue date reaching October 4 means the file was still adding rows through the end of the window, not only the first weekday.
Why it matters in Marin
Marin’s housing market and wildfire-adjacent building rules make permit activity a practical local signal even when news coverage is thin. A hundred-plus residential-heavy week is evidence that households and contractors were clearing the county desk.
Readers watching ADU interest, remodel seasons, and commercial vacancy can use the 98-to-3 split as this week’s open-data snapshot.
Bay Area county context
Marin’s open data portal is the source of truth for this count. Notice Nearby only republishes the weekly summary with a quiet Filed Nearby byline.
Commercial at three rows is not “no commercial activity forever.” It is this window’s commercial issued count. Watch the next pull before drawing a trend line.
How to read this notice
Start with the week total (101), then residential versus commercial, then the newest issue date (October 4, 2026).
Quiet byline: Building permits · sourced with Filed Nearby.
Notes and sources
- Building permits · sourced with Filed Nearby. https://www.filednearby.com
- Window September 28–October 4, 2026. As of 2026-10-05T07:57:01-07:00. Hub: Marin County, California.
- Author: publisher@noticenearby.com / Record of Sale, LLC / Notice Nearby.
- Not legal advice. Not a newspaper. Not Legal Publication. Record of Sale, LLC (Oregon).
Building permits shelf · Zoning desk. Building permits · sourced with Filed Nearby (https://www.filednearby.com). xPostUrl null.
Not legal advice. Not a newspaper. Not Legal Publication. Record of Sale, LLC (Oregon).