Starlink powered

Not a government websiteIndependent public notice register

Morning public-notice pack · October 5, 2026

Bend building permits, September 28–October 4, 2026

Public notice. Bend’s public permit map service lists 105 permits with an issue date from September 28, 2026, through October 4, 2026.

Public notice. Bend’s public permit map service lists 105 permits with an issue date from September 28, 2026, through October 4, 2026.
Public notice. Bend’s public permit map service lists 105 permits with an issue date from September 28, 2026, through October 4, 2026.

Download PDF

noticenearby.com/papers/or-deschutes-bend-building-permits-sep28-oct4-2026.pdf

Public notice. Bend’s public permit map service lists 105 permits with an issue date from September 28, 2026, through October 4, 2026.

Type descriptions: Electrical (27), ROW (19), New Construction/Installation (14), Mechanical (9), Sign Application for Permanent Sign(s) (8), Renovation/Alteration (6). Building category: Residential (54), Other (41), Commercial/Industrial (10). Use descriptions when present: Single Family Dwelling (47), Commercial or Industrial (9), Accessory Dwelling Unit (3), Townhome (Attached Single Family Dwelling) (2), Duplex (1).

Status: Permit(s) Issued (94), Closed (11). On the 28 rows that carried a project valuation, the summed figure was $6,339,030.

Central Oregon’s largest city still shows a residential backbone — single-family dwelling use tags lead where use is filled in — alongside electrical, ROW, mechanical, and sign work that keeps contractors busy even when big vertical permits are quieter.

For Deschutes County readers on /or/deschutes, a hundred-plus weekly permits is a solid mid-week construction pulse worth watching against winter slowdowns later in the year.

What the count covers

Aggregates use Bend’s permitting table feature service. Valuation is summed only where the city published a number. No street addresses on this page.

Why it matters

Electrical and ROW volume can outnumber new-construction labels in a given week; that does not mean housing stopped — it means the counter was busy with systems and right-of-way work too. Quiet byline: Building permits · sourced with Filed Nearby.

High Desert counter reality

Bend’s permitting table often shows electrical, ROW, mechanical, and sign volume alongside new construction. That is a full building department, not a failure of housing permits to appear.

Single-family dwelling use tags remain the clearest housing signal when the use field is populated. ADU tags, when present, flag middle housing and backyard units.

Seasonality note

Central Oregon building seasons stretch with weather and tourist calendars. Use this week as a baseline for later autumn and winter Filed Nearby pulls.

Project valuation appears only on some rows; our sum covers those rows only.

How to read this notice

Read BuildingCategory and UseDesc for housing signal; TypeDesc for the full counter mix.

Notes and sources

  1. Building permits · sourced with Filed Nearby. https://www.filednearby.com
  2. Window September 28–October 4, 2026. As of 2026-10-05T07:42:22-07:00. Hub: Bend, Oregon.
  3. Author: publisher@noticenearby.com / Record of Sale, LLC / Notice Nearby.
  4. Not legal advice. Not a newspaper. Not Legal Publication. Record of Sale, LLC (Oregon).

Building permits shelf · Zoning desk. Building permits · sourced with Filed Nearby (https://www.filednearby.com). xPostUrl null.

Not legal advice. Not a newspaper. Not Legal Publication. Record of Sale, LLC (Oregon).